狠狠色丁香九九婷婷综合丨一级片特黄丨韩国三级hd中文字幕叫床丨五月天精品丨日本成熟视频免费视频丨国产乱子伦60女人的皮视频丨亚洲xx网站丨国产亚洲精品久久久久蜜臀丨男女羞羞羞视频午夜视频丨亚洲天堂2015丨亚洲精品成人av在线观看爽翻天丨日韩午夜免费丨国产成人在线综合丨国产 成人 综合 亚洲 网站丨九九久久久丨艳妇荡乳豪妇荡乳av精东丨天堂av免费看丨黄网址在线观看丨日韩一级黄丨黄色av网址大全

[Jin Cheng textile industry air conditioning principle]
Release date:[2023/3/23] Is reading[258]次

With the development of the new textile industry and gradually established, its main task is to create and maintain air conditions in the production workshop to meet certain requirements, so that the temperature, humidity, flow rate, dust concentration and freshness of the workshop air can meet the requirements of the production process and human comfort, and will not change because of the outdoor air parameters and various indoor factors.

1. Upgrading of air conditioning equipment

Fan is the core equipment of air conditioning system. Jincheng textile industrial air conditioning originally used mostly for the imitation of Soviet V series axial flow fans, which are characterized by small air volume, large consumption of star, low efficiency, belt transmission, high running cost, and sometimes the formation of coal dust yarn affecting the quality of products. If the fan is transformed into a frequency conversion fan, whether equipped with frequency conversion governor or stepless speed regulation system, the air volume can be freely adjusted by the regulator according to the needs. Or the use of programmable controller technology, to achieve the unified control and automatic operation of air conditioning equipment such as fans, water pumps, so that the action and operation conditions of each equipment fully meet the production requirements, and can be adjusted under the centralized command of the center, so as to realize no adjustment.

2. Use the return air and temperature and humidity properly

Reasonable use of return air is not only beneficial to stabilize the temperature and humidity of the workshop, reduce production fluctuations, improve production quality, and can greatly reduce the energy consumption of air conditioning. Even in the transition period of spring, summer, autumn and winter, as long as we control the proportion of return air, spray and wash the air with circulating water, we can improve the quality of air supply and save energy. Especially in summer, with the increase of outdoor wet bulb temperature, the return air volume must be increased correspondingly, otherwise it will cause a waste of cold volume. The fresh air load accounts for a large part of the air conditioning load. The positive pressure in the workshop should be maintained while the hygienic requirements are met. Under normal conditions, the amount of fresh air is only 10 percent of the air supplied by the system.


Industrial air conditioning, chemical fiber industrial air conditioningchemical fiber industry refrigeration, textile industrial air conditioning, dust-free workshop coolingventilation pipeline, cooling tower, freezer and other air conditioning units and accessories.

Jiangsu Jincheng Air Conditioning Engineering Co., Ltd. is a comprehensive manufacturer of special air-conditioning equipment design, production, installation, and commissioning of clean room, electricity, tobacco, civil air defense engineering, medical clean room, clean room, electricity, tobacco, civil air defense engineering, medical clean room. Mainly produce JCZK combined air conditioning unit, cooling tower, glass steel ventilated galvanized sheet pipe, stainless steel pipe, polyurethane ventilation pipe and air conditioning accessories, Jincheng air conditioner is wide, the type, the unique model, superior performance, and user Favused.


Keyword:
ADD:No. 18, Rongguang Road, National High-tech Park, Yancheng City, Jiangsu Province Phone: 0086-13705113637 Tell: 0086-0515-88809180 Fax: 0086-0515-88809181 E-Mail: jsjckt@126.com
Copyright ? 2018 All rights reserved
Copyright Jiangsu Jin Cheng Air Conditioning Engineering Co.,Ltd 技術支持:中國丙綸網